ผลงานติดตั้งSmart Film GUNKUL — Boardroom for an ESG-Era Energy Corporation โดย InHouse Technology

GUNKUL — Boardroom for an ESG-Era Energy Corporation

Smart Film brand owner — full-service installation, done in-house · 24/7 nationwide

5.0 · Project Quality Rating

One City Centre (OCC), 44th Floor, Pathum Wan District, Bangkok

Area/room

15 sqm

Installation

2 days

Installed

Apr 2025

Review from Operations Center Manager · GUNKUL

"The result was truly worth the wait. Meetings run smoothly with no worry about outside eyes, and we finally have the privacy we always lacked. The boardroom image befits a leading ..."

View all installation photos

Project details

Project name
GUNKUL — Boardroom for an ESG-Era Energy Corporation
Customer
Gunkul Engineering Public Co., Ltd.
Location
One City Centre (OCC), 44th Floor, Pathum Wan District, Bangkok
Project type
Meeting Room / Conference · Offices · Corporate HQ · Tech
Installation date
5 Apr 2025 (2 days)

Challenges & solutions

Customer challenges & requirements

"We have many meeting rooms, both small and large, so we wanted a top-tier privacy standard for every room to protect business information, with instant mode switching the moment a confidential meeting begins."

— Operations Center Manager · GUNKUL
Top-tier confidentiality of business data
Investment data, energy plans, and meeting agendas must stay 100% confidential at all times.
A premium corporate image
It had to suit the design of One City Centre's 44th floor, a premium-grade Bangkok building.
Instant use with no lag
It must switch modes instantly the moment a confidential meeting begins — no waiting or delay.
Easy use by staff at every level
Every employee can use it right away without complex training, easing the IT team's load.

The solution we proposed for this project

Fully 100% opaque to protect confidential agendas
Blocks the view from outside across every pane when switched, ideal for a boardroom discussing M&A and ESG.
An image that suits OCC's 44th floor
Glass with no blind tracks or cluttered cords, a minimal design befitting an energy corporation.
Switch modes in 0.1 seconds, no lag
Instant every time a confidential meeting begins — no lost momentum drawing curtains or closing blinds.
One-button use, no training
From C-Suite executives to reception staff, everyone can use it right away, easing the IT/FM team's load.
Integrates with building BMS and corporate meeting systems
InHouse Smart Home links the OCC building system + GUNKUL's room-booking system to switch modes automatically.
Cuts a Green Building's CO2
Blocks IR/UV 99.99%, cutting air-con costs 25-40% to meet LEED Green Building standards.

Results after installation

Before
  • Clear-glass meeting rooms lacked privacy
  • couldn't conceal confidential meetings
After
  • Top-tier privacy
  • meeting rooms that look modern and are ready to use instantly
Review from a real customer

"The result was truly worth the wait. Meetings run smoothly with no worry about outside eyes, and we finally have the privacy we always lacked. The boardroom image befits a leading energy corporation — well worth the investment."

— Operations Center Manager · GUNKUL (May 2025)

GUNKUL's boardroom at One City Centre safeguards the confidences of a leading energy business, worthy of its ESG vision.

Frequently asked questions

About installing Smart Film

How well can a leading energy corporation's boardroom use smart film to protect confidential ESG/M&A agendas?

InHouse smart film is 100% opaque when switched · it fully blocks the view from outside · ideal for a public company's boardroom discussing sensitive ESG / M&A / earnings agendas that must not leak · no lost momentum closing blinds mid-meeting when a confidential topic comes up unexpectedly · it boosts confidence in C-Suite meetings and hosting foreign investors.

How does smart film help an energy company's premium building pass LEED Green Building criteria?

InHouse smart film reduces heat entering the building 40-55% · cuts air-con costs 25-40% · lowers the building's CO2 emissions across its lifespan · uses low power at just 3W/sqm/hr · it meets the energy-performance criteria that LEED, EDGE, and TREES use for Green Building assessment · ideal for a leading energy company that must set an example in sustainability and ESG reporting to investors.

Can a corporation's Smart Office/BMS integrate with smart film so one system manages everything?

Yes — InHouse Smart Home connects to the corporate calendar, BMS, and Smart Office Hub · Auto-Tint automatically when a confidential meeting begins · add a remote, wall switch, Thai voice control, or a mobile app for executives · the corporate IT staff can integrate directly via standard APIs · it eases system-management burden and creates a single pane of glass for facility management.

Can executives at multiple levels switch smart-film modes conveniently with no training — is that true?

True — one button changes the mode in a fraction of a second · C-Suite executives, office managers, and meeting-room staff at every level can use it with no training · it eases the IT/FM team's load of supporting new equipment · it boosts meeting-room efficiency in a large organization with many users who want naturally easy-to-learn technology.

How quickly does a smart-film investment in a public company's boardroom pay back?

InHouse Indoor Series lasts 12+ years · Outdoor + Aquaris™ and Performance + Lucida™ last +80% versus standard PDLC · it cuts air-con costs + curtain-cleaning costs + permanently eliminates glass-replacement costs · payback comes quickly in 3-5 years · an ESG investment investors view favorably that also reflects an energy corporation seriously investing in innovation.

Will smart film in a premium building like One City Centre last as long as the building?

Yes — InHouse smart film is designed to pair with a premium building like One City Centre (OCC) for 20+ years · no replacement needed across a long-term lease · very low maintenance · ideal for a large organization investing long-term in a Mega Project building that wants easy facility management without frequent material-replacement planning.
Ready to Transform?

Want an installation like this
for your Smart Film project?

The InHouse engineering team is ready to advise, quote, and survey your site free of charge — installed 100% by the brand owner's own team, never subcontracted

4.9/5 · from 269+ real projects
Our team is Online 24/7 — avg. reply 1–5 min

No showroom visit needed — we bring the samples to your site

Our engineers bring every grade of smart film to compare on your actual site

  • Compare every grade on site — see the clarity, colour tone and how it fits your real room before deciding
  • Site survey + surface-prep advice — know the constraints and what to prepare in advance
  • See the real result before installation — simulate the outcome on your actual glass — no guesswork
100% Free No hidden fees
10,000+ Projects delivered
Smart Film 12+ yrs · 6,700+ THB/sqm
Smart Glass Premium · 15+ yr base · +50% boost · from 14,500 THB/sqm
10,000+ sqm stock / model
24/7 After-sales service
Our Locations

Partners & Showrooms

InHouse Smart Film Head Office Head Office
Häfele Design Center — InHouse Smart Film partner Design Center
HomePro Partner Store — InHouse Smart Film partner Partner Store
Samsung Flagship Store — InHouse Smart Film partner Flagship Store

*Please book ahead via LINE Official for a smooth visit